Your technician is at the aircraft. Is your material ready?
Skylink builds, stocks, and delivers your line maintenance kits. One kit part number in place of a long parts list. The full bill of material inside, complete, every time.
Readiness comes down to one moment. The tech opens the box and everything's there, or it isn't. Do it by hand and that moment rides on up to 20+ expendables, sourced from 6+ vendors, tracked across a stack of invoices. One backordered line item and a scheduled check turns into a rush order at spot-buy prices. That's a lot of weight sitting on your desk. We take it off.
Price a kit for your fleet
Send us the part numbers from one task card. A screenshot works. We quote the kit back line by line, priced per kit. No volume forecast. No contract talk.
Next step: Tyler emails you within one business day. Reply with the part numbers. They stay with us.
Here's what shows up on your dock.



"We already run kits."
Then reliability is the problem. Kits show up a line item short. Or you buy the parts yourself and pay a vendor to build them. Two invoices, two lead times, one more handoff for your planners to babysit. A kit you can't trust is worse than no kit.
Make our kits reliable"We're not ready for kits yet."
Then you're planning 4,500+ line items by hand. Sourcing each one. Chasing OEM lead times. Watching a 90-day filter blow up a weekly check. Every line item is a place for the schedule to break, and your team is the only thing holding it together. Start with one bundle. Your kits grow from there.
Start with a bundleJust one of our kitting customers.
Start with a bundle.
A bundle is every part number for one task, in one box. One filter change is a filter, a couple of seals and a handful of packings. We put every line on one PO, ship it in one box, and send one invoice.
Your system buys the same part numbers it always does. Nothing to set up. When you're ready, the bundles you buy most become your first kits.
Stock outages? Not on your bundles. Share your yearly usage, and we guarantee the stock.
Get the bundle price
Pick a bundle. Tyler sends your price within one business day.
Next step: Tyler emails you within one business day.
CFM56-5B Engine Oil Filter Bundle
See the part numbers
| Part number | Part | Qty |
|---|---|---|
| CA00077B | Filter element | 1 |
| 337-081-301-0 | Back-up seal | 1 |
| 337-081-101-0 | Back-up seal | 1 |
| 649-393-151-0 | Packing | 1 |
| J221P016 | Packing | 1 |
| J221P153 | Packing | 1 |
CFM56-5B Fuel Filter Bundle
See the part numbers
| Part number | Part | Qty |
|---|---|---|
| CA01962B | Filter element | 1 |
| M25988/1-906 | Packing | 1 |
| M25988/1-156 | Packing | 1 |
| M25988/1-123 | Packing | 2 |
LEAP-1A Oil Filter Bundle
Sold to aircraft operators only, with a signed end-use letter.
See the part numbers
| Part number | Part | Qty |
|---|---|---|
| B1316-04911 | Filter cartridge | 1 |
| M83485/1-147 | Packing | 1 |
| M83485/1-011 | Packing | 1 |
| M83485/1-151 | Packing | 1 |
LEAP-1A Fuel Filter Bundle
See the part numbers
| Part number | Part | Qty |
|---|---|---|
| 1326-8043 | Fuel filter | 1 |
| 1381-1176 | Retainer | 2 |
| 1391-0243 | Packing | 1 |
| 1391-0275 | Packing | 1 |
5909812 Filter Element Bundle
See the part numbers
| Part number | Part | Qty |
|---|---|---|
| 5909812 | Filter element | 2 |
| A225400454-204 | Fleece | 3 |
| M83248/1-214 | Packing | 2 |
| AS3209-226 | Packing | 2 |
| M83248/1-905 | Packing | 2 |
3880938-1 Filter Element Bundle
See the part numbers
| Part number | Part | Qty |
|---|---|---|
| 3880938-1 | Filter element | 2 |
| M83248/1-227 | Packing | 2 |
A320 Filter Set Bundle
Heavy box: it ships as a heavy shipment.
See the part numbers
| Part number | Part | Qty |
|---|---|---|
| 424B200-7 | Filter cartridge | 2 |
| 4200A200-6 | Cartridge assy | 1 |
| 425A200-5 | Demister filter | 1 |
| G901261-1 | Air filter | 2 |
| A225400454-204 | Fleece | 3 |
A320 QAR Data Card Bundle
Commercial parts: no aviation certs. Each card ships in its own case. PCMCIA slot? We supply the PCMCIA card version.
See the part numbers
| Part number | Part | Qty |
|---|---|---|
| TS16GCF1000 | CF card 16GB | 1 |
| TS0MCF2PC | CF to PCMCIA adapter | 1 |
If you buy it together, we'll bundle it.
The eight above are A320 bundles. Yours might be a B737 task, a one-off project, or the parts your line reorders every month. Any aircraft we support. Send us the task, the aircraft and the part numbers. You get one price for the whole set.
Price my bundleNot ready to send part numbers yet?
That's fine. Most visits start that way. We will send you a case study instead, so you can see more how this can benefit your operation and how line maintenance kits actually work.
It forwards well, too. Send it to whoever owns your material and let the numbers do the talking. We can speak to them as well.
Nine ways a kit program pays off.
You plan kits, not parts
Order one kit part number and the whole bill of material shows up inside it. One kit can cover a single task card or a whole series of them. Your planning drops from thousands of line items to a handful of kits.
Complete. Guaranteed.
No kit ships until it's confirmed complete. Built to your task cards, built to be fully consumed. Zero kickbacks. No "where's the other half of this kit."
You'll know if it's been opened
Kits get robbed on the floor. Every kit ships strapped closed. Crack the strap and it's obvious the box was opened before it ever reaches the shelf. What you ordered is what gets used.
We carry the inventory, the lead time, and the reorder
We stock your material ahead of need. Capital off your balance sheet, OEM lead times off your desk. Connect our ERP to yours and the next batch ships automatically at a trigger level.
Your price doesn't move
Fixed pricing at the bill-of-material level. Tariffs, shortages, OEM increases. They hit us, not your budget.
Delivered to every base
Deliver to one hub, then we route to all your stations. Twenty stations or two, the kit lands where the check is.
We watch your kit health
We track every kit number and bill of material against your consumption forecast and the lead times behind it. When a part trends short, you hear it from us early, with the fix already in motion. And you can watch it all on a kit-health dashboard.
Priorities change. We move with them.
A check moves up. A station runs hot. A new tail shows up early. Tell us and we resequence and reprioritize your kits without a change order or a fight. We call it the priority pivot.
You call, we answer
We don't chase hundred-million-dollar contracts. We run a short list of customers and give each one a 24/7/365 account manager.
Send us the part numbers. We'll price the kit.
Pricing a kit used to start with your planner exporting a bill of material and a year of volume. We asked for that too. Turns out nobody has a free afternoon to build a spreadsheet for people they've never bought from.
So skip the spreadsheet. Pull up one task card you run all the time and send us the part numbers on it. A screenshot works. Your part numbers stay with us. We quote the kit back, line by line, with a price per kit. If the number works, then we talk about your volume. If it doesn't, you keep the numbers.
Price my kit Not ready yet? Get the case study instead.Questions material teams ask.
Does this work in AMOS and TRAX?
Yes. Both are built for kitting, and we run kit programs for customers on both. In your system, you order one kit part number, and AMOS or TRAX plans, allocates, and issues every component line behind it against your work package or task cards. Run it as a planning kit or a prebuilt kit on the shelf for quick issue. We deliver the complete kit against that one part number, documented and traceable. It fits the way your team already works.
We tried kitting in our ERP and it broke our accounting.
We've seen the kit function write off part value or fail to translate cleanly into your finance system. You don't need to fight your own setup to do this. You order a kit part number from us and we hold the bill of material behind it. We can also connect our ERP to yours, so when your kit stock hits a trigger level, we send the next batch automatically.
Do we have to kit everything at once?
No. Start with one check or one task you run constantly. Prove it. Stack on top of it.
Airbus and Boeing? We're integrating fleets.
Kits are kits to us. A320, 737NG, MAX. Doesn't matter. We build more 737 kits than Airbus. A fleet integration is exactly when kitting gets simpler, not harder.
Hardware only, or consumables and chemicals too?
Mostly hardware and expendables. We do consumables and chemicals too, but shelf life, hazmat, and shipping change the math. We'll tell you what belongs in a kit and what your stations should absorb.
What about credit?
We run healthy credit lines for kit programs, up to seven figures. We set that up once you've seen a real kit, not before, so nobody wastes time.
How fast do you respond?
Send the form or message us and you get a person, not an auto-reply. You'll be dealing with a dedicated account manager, with a kitting team standing behind them. We've answered calls, chats, and emails in under five minutes.
